ORS Infra – Royal Residency

Hi All,

I hope that all of you are looking for an update about Royal Residency Faridabad. Either you have invested already or you want to invest in the Royal Residency of ORS Infra – Sec 89 Faridabad. 

Let me tell you guys that I am an investor like you in the same Property and own a 3 BHK Flat. 

So, the purpose of this Blog is to update you about the latest Progress of Building construction, Upcoming highways, Road construction across the sectors, Delhi to Sec -89 Road, Road construction Neharpar, Delhi Metro Station in Fraidabad and all the other latest upcoming avenues.

Company Information :

The company is coming up with a World Class Group Housing Project in Sector – 89,Faridabad.The company is also planning to develop farm houses with modern amenities and a integrated township in Bhiwadi,which will be one of the finest choices among NCRs.The company has a vision to build a World Class Real Estate Development Company.

Bhomi Pujan :

Bhoomi Pujan was done on 18th July 2008.

Location Map :

 

Click to see here in google map

Click to see here in google map

 

 

 

Location in Google Map

Location in Google Map

 

Floor Plan :

Layout Plan of 2 Bhk ( 1200 Sq Feet )

 

2 BHK Floor Plan

2 BHK Floor Plan

Layout Plan of 3 Bhk ( 1500 Sq Feet )

3 BHK Floor Plan

3 BHK Floor Plan

 

Friends, I want us to be in touch for this ORS Infra updates. 

I hope that you guys can join me here and make my effort successful.

You can join me here on yahoo groups as well :  ORS_faridabad_nic_nhps@yahoogroups.com

Thanks,

Mayank

144 Responses

  1. This is good information and at this place we can do some more research on what is going on in ORS Infra

  2. Thanks Rakesh for your inputs

  3. Hi, can any one tell me what is the present status of construction. Sample flat was supposed to be ready in Jan-09.

  4. Hi Kiran, I am in touch with ORS POC , MR Vipin. I will contact him and let you know his response. Soon, I am planning to update videos on weekly or monthly basis.

    Thanks,
    Mayank

  5. Hi Mayank,
    This is really a good place where we can share any updated related to this project. I sent an request for membership of above mentioned group on yahoo. As per my knowledge, they are suppose to complate their sample flat upto May, 09. I don;t think that these people has start construction of sample flat. This sunday i am going to visit the site and will give yo the updates.

    Manish Gupta
    9990010860

  6. Hi Manish,

    Please provide your information regarding the ORS. Are you one of the members of ORS ?

    If yes, please let us know your membership number.

    Thanks,
    Mayank

  7. dnt wry about the sample flat. the wrk is proceeding with full vigor.m impressed by the quality of material being used.

  8. Hello Anonymous,

    Pls attach your flat number or membership number including your name as well.

    Good to know that your impressed by material quality and work progress.

    Can you please let us know when the sample flat will be ready.

    Thanks,
    Mayank

  9. Hi Mayank,

    My flat number is A1-503. Last sunday I visited the site and I found that these guys has started the production at full swing. I hope that sample flat should be ready by May-09.

    Guys, keep posting on this forum along with your flat number so that we can better recognise you.

    Manish Gupta

  10. Hi
    Let me first thank u all for showing confindence in the Company and project.I assure u all that the quality of construction will be excellent . As far as sample flat is concerned we will be finishing it in the tower itself by may 09.
    thanks and regards

    Vipin

  11. hi

    can anyone tell me what is the price (including all the additional charges) of 2BHK unit and 3BHK unit?

    neeta

  12. Hello Vipin,

    I spoke to my lawyer for home loans regarding the 2nd installments.

    Now here are the items required to process the loan amount.

    1. Copy of your agreement with builder
    2. Index II extract of your agreement with builder
    3. Property register card of the land under construction
    4. Copy of residential use permission for the land
    5. Search and title report of the land under construction
    6. Copies of documents mentioned in the search and title report
    7. Development agreement between owner of land and the developer (if different)
    8. Copy of order under Urban Land Ceiling act (if applicable)
    9. Copy of building plans sanctioned by competent authority
    10. Building permission / Building commencement certificate
    11. Building completion certificate (if available)
    12. Latest receipts of taxes paid by the builder
    13. Partnership deed or Memoranda mod Association of the builder’s firm

    Can you please provide me how and when can talk on the items mentioned above.

    Thanks,
    Mayank

  13. hi Mayank,

    which bank you are persuing for home loan.I would advice you to go in for home loan from lic housing finance as the project is already approved from them and it will be easier to get home loan from lic

    thanks
    vipin vashista

  14. hai mayajain
    i have full confidence in ors company . in recession ors is going well. my flat no.is b-1 1001 i e 10th floor. continue the progress
    thanks

  15. Hi All,

    Thanks for startig blog like this.I am Abhisek and I have also purchase a 2BHK in ors royal residency.
    So can any one who has been to ors recentrly tell me the status.

    Abhisek

  16. Congrats..All
    From 1st April the LIC Homeloan ROI will come down by 0.75%.

  17. Hello Dr. Dabra,

    Can you share your contact infomration with me. I am also a member of ORS Royal resideny. My flat number is A1-503.

    Regards,
    Manish Gupta
    9990010860

  18. Hi All,

    I am also the member of ORS royal residency and if anyone has visited the site recently can let us know about the staus at the site.

    Regards,
    Abhisek
    B1-1004
    9999353142

  19. Greetings all;

    Great to catch up with the neigbours , world is really small and the digital age for sure breaks all barriers.

    I am Arvind working with Yahoo and have purchased a 3BHK flat number – A1 – 703.

    Like all stake holders I am eagerly awaiting to see the sample flat , May end is mentioned by in the thread above as the potential date but i think it is taking some more time. If any one has an update on the same please update the community.

    Thanks and Regards
    Arvind Mathur
    9910129922

  20. Hi Friends,

    All of us are waiting from a long time to see the sample flat. ORS guys has promised to complete their sample flat by May 09 (date given by Mr. Vipin himself in above forum).

    Till now i don’t see any information of sample flat from these guys. I think now its time to get together at site and ask ORS about the real position.

    I know a few guys who has booked their flat in ORS Royal Residency and all of them are interested in coming and discussed their all concerns.

    Let me know if any of you guys are also interested to be a part of this gathering.

    Also, Please mention your flat number + tower number along with your name and phone number while posting any message so that we can easily recognize you and contact you.

    Regards,
    Manish Gupta
    A1-503
    9990010860

  21. Hi All,

    I hereby request to all the person who have purchased flat kindly assemble on sunday 11 am on the site and ask them about the sample flat.

    Abhisek
    sinha.abhisek@gmail.com
    9999353142

    • Hi Abhishek,

      It was nice to have a discussion with you.

      This weekend I will not be able to come there because i am going out of station for some official purpose and will come back at next weekend.

      Regards,
      Manish Gupta
      A1-503
      9990010860

  22. I visited the site on 9th June’09 and the construction is going on. However, I do not see that going with full swing and I have reservation whether they would be able to complete it on time.

    My main concern is the connectivity. When the highway or concerned authority is going to start road structure?

    I have 3-BHK A-403

    Regards
    Krishan
    9891147877

  23. Anyone visited the site recently, kindly update.

    Any news on road development side.

  24. Hi Guys,

    I came to know that in last month (june) LICHF has decreased rate of interest by .5%. Do you have any information related to the same? Did any guy got any information from the LICHFL?

    I don;t know from when it will get implemented and we will be cover under that plan or not.

    Regards,
    Manish Gupta
    9990010860

  25. COMPANY HAS NOW NEW WEB ADDRESS

    http://www.orsinfra.in,

    for latest site photos please visit above site

    Thanks

  26. Hi All,

    Hope you are doing great. I am “Somya Kulshrestha”. I have already talked to few of you in the last couple of months.

    Did any one visit the site recently? Hows the progress going on and wat abt the sample flat status?

    I will visit by end on Oct’ 09 and post my comments/obervastions in this section.

    Thanks and regards,
    Somya Kulshrestha
    9873722359
    A1 – 603

    • Hi Somya,

      Please give me a call before you visit the site. I will also come at same day.

      In case anyone else also interested, it is good oppertunity to meet at a single place and discuss our concerns and apprehensions.

      Regards,
      Manish Gupta
      99900-10860
      A1-503

  27. Hi Guys,

    You can see the latest photograph on
    http://orsinfra.in/site.asp

  28. Hi All,

    Wishing a very happy Diwali to you and your loved ones…

    Did anyone visit the site recently? Any update?

    Regards,
    Somya Kulshrestha

  29. Hi,

    I am going to delete this Blog. Hope we had a gud time over here.

    Thanks,
    Mayank

    • Hi Mayank,

      If you don’t want to maintain this blog, please handover this blog to some other member like me. We will manage it.

      It will better for all the ORS members to continue this blog.

      Regards,
      Manish Gupta
      99900-10860

  30. Hi Guys,

    Season Greetings for you and your loved ones.

    Anybody have any idea when the HUDA will start work on infrastructure. I believe they haven’t acquire the land for the roads. Because Infrastructure is my main concern for Royal Residency.

    Can anybody suggest any link where I can see the HUDA plan.

    Regards
    Manish Gupta
    A1-503
    99900-10860

  31. GOOD NEWS FOR ALL THOSE WHO HAVE KEPT FAITH IN THE COMPANY. ADMINISTRATOR HUDA HAS STATED THAT LAND AQUISITION FOR ROADS WILL BE COMPLETED BEFORE 15TH FEB 2010 AND INFRASTRUCTURE WILL BE PUT IN PLACE IN SIX MONTHS AFTER THAT
    REGARDS

    VIPIN VASHISTA
    9311443301

    • Hi Vipin,

      Thanks for this updates.
      Can you please share any ressource/URl/Whitepaper where Huda is saying the same?

      Regards,
      Manish Gupta

  32. Hi All,

    This is the wonderful news and this news was published in the dainik jagran newspaper for which i am giving the link.

    http://in.jagran.yahoo.com/news/local/haryana/4_6_6113473_1.html

    Regards,
    Abhisek

  33. You guys made my day 🙂

    So we still have a hope to get possession by this year end.

  34. Thanks Vipin & Abhisek, For providing us the update on further Infrastructure plans in greater faridabad.

    This is really a very good news for all the investors of ORS.

    Regards – Jai

  35. Who want to maintain this blog ?

    I am leaving from India once again… I do not have time to approve the comments.

    Pls let me know within 2 days.

    Thanks,
    Mayank

    • Hi Mayank,

      I want to maintain this blog. Please pass on the details to me so that I can continue this blog.

      Regards,
      Manish Gupta
      99900-10860

  36. Hi Guys,

    I am still not very comfortable about the status of the basic immunities.

    In my personal opinion, I don’t trust the links like given above by Abhishek (please don’t mind Abhihesk).

    I have another link which says something else but I talked to this person and this person is ready to show me the RTI came from Huda.

    For more details, please see this link
    http://www.indiaspaces.com/blogquestion.aspx?qid=116

    Regards,
    Manish Gupta

  37. Hello Vipin,

    What are your thought about the link shared by Manish above.

    In case you have different updates, please share.

    Thanks
    Harvinder

  38. Hi Vipin,

    I was shocked to hear that the flat which we have booked is ready to live around 2013.And not anywhere in this year or next year.In that case we are at great loss.

    Abhi

  39. Hi Friends,

    Has anybody visited the site recently? If yes please share the updates.

    I am not sure that if the sample flat (planned in May 2009) will be ready by this May (2010)?

    Regards,
    Manish Gupta

  40. Hi All,

    Probably I am afraid of sharing my name.

    But am one of the victim of ORS Infrastructure.

    Guys these people have constructed only 3 floors in last 1 year if you see and I do not see any hope even after 2013 as Abhishek mentioned.

    Aur waise bhi 2015 se pehle wahan kuch nahi hone wala hai.

    @Dabra, I do not see good news. You can see the quality once this flat will be ready.

    There are many builders who are making same kinda flats in sec 89, 88 and 86 at almost half of the price with same quality.

    Also, if they are ready with flats by 2013, there are less chances that HUDA will provide water supply before 2015.

    I wish all d best coz My money is gone and I want you ppl to circulate this message to all of the folks who are looking for cheap home with such builders.

    Thanks,
    Pankaj

    • Hi Pankaj,

      Can you please share your cell number. I just wanted to know your case and inputs in details.

      Regards,
      Manish Gupta
      A1-503
      9990010860

  41. Also Compare the Sites Actual Pics in 2008 and 2009.

    only 4 floors. Good Work ORS

    http://orsinfra.in/site.asp

  42. Dear all;

    These remarks just make all of us uneasy , lets all connect on these issuus with the ORS team and take a concrete plan. I myself have been awaiting a sample flat since 2008 which doesent seem to be in site too.

    I would requesr all of you to please fix a date ( Say 7th of March- Sunday at 3 Pm at the Royal Residency site to check the real progress and mutually approach ORS for a realistic deadline.

    Please confirm for the same by mailing me on arvindm1981@gmail.com and i shall comple a list and mark a CC to all interested individuals to finalize this. Once the meeting is done we should also make the minutes of the same and circulate to follow up and give base to future communications.

    Also a big thanks to the active moderaters and individuals who have been actively involved with the updates on the project.

    Regards
    Arvind Mathur
    A1 – 703
    9910129922

    • Hi Friends,

      I have already sent my name to Arvind. I believe this is the right way to raise the voice.

      Even I will call personally some people (whom I know) have invested their money in ORS projects.

      What I believe is that ORS people are not too bad but its the basic immunities provided by HUDA which is getting delayed. And that is what ORS people is making as reason of their latency. But yes, if ORS people knew in advance that what is happeing, they didn’t pass this information to us.

      I request all of the followers of this channel to join us on given date (7th March) and discuss the next strategy.

      Regards,
      Manish Gupta
      A1-503
      9990010860

  43. Hello Manish/Arvind,

    I wish I could join you guys but I am currently not in India.

    I hope you will put the updates on this link so that it can benefit people like me.

    And thanks for taking this up. I appreciate your initiative here.

    Thanks
    -Harvinder

  44. Dear Friends –

    Sub :ORS buyers Meet on 7th March 2010 – 10.30 AM

    Hope you all had a great holi.

    We are scheduled to meet at the ORS Construction site on the 7th of March at 10 : 30 AM.

    We already have 8 members who have confirmed their particpation and I would urge all other members to try and participate in this forum to have clarity on the progress of the project.

    Also i would request the buyers to please mail your contact coordinates to Myself so that we can have a comprihensive database of ORS Members and regular updates can be shared. I can share an updated database with all once its done.

    You can Mail at -arvindm1981@gmail.com

    Thanks
    Warm Regards
    Arvind Mathur
    A1 – 703
    9910129922

    • Hi Friends,

      This is really important that we can bring as many people as we can.

      No need to say but still I request all of us to be available on site at given time (sharp 10:30 AM) so that nobody has to wait.

      Regards,
      Manish Gupta
      A1-503

    • Hi Friends,

      Thanks for coming to the site (Royal Residency) on 7th march and we had a great discussion.

      I just wanted to update the other people who have not joined with us yet and also looking for the updates.

      Please send me an email on netaddress@gmail.com or call me at 9990010860 for the updates.

      In addition to that, I am maintaining member list with their contact details and allotment details.

      We are also collecting the questions from all the investors who want to ask anything from ORS regarding this project.

      Please feel free to send me the questions on netaddress@gmail.com. We will wait for all the requests for next two weeks 20 March and then we will compile the list and present it to the ORS guys.

      regards,
      Manish Gupta
      9990010860
      netaddress@gmail.com
      A1-503

  45. Hello All,

    Here is the news that is being published in todays(03/05/2010) times of india newspaper regarding the Taj express way.

    http://timesofindia.indiatimes.com/city/delhi/Taj-expressway-to-open-before-Games/articleshow/5644679.cms

    Thanks – Jai

  46. Hi Friends,

    I am sure everybody is looking for updates of the meeting held on 7th March. So here are the updates of the meeting.

    A few members from us were gathered on given time (I would like to thank them to be on time and looking for same support in future) and had a detailed look on the constructions. Here is the status of construction work

    Block A1 and A2 built up to 5th floor however block A3 has been developed up to 3rd floor only.
    Block B1, B2 were developed up to 4th floor
    Block C1 – just basement built and C2 is no where till now.

    We had a discussion about a few things in building with the engineer Mr. Bedi and he has answered them very well. These questions were related to the beams which were coming inside the rooms and which are noticeable in ceiling as well as seems to be wastage in Almira space. Well I am not the right person to judge it because I don’t have architect kind of expertise.

    After have a discussion with Mr. Bedi, we had some concerns which we need to get clarified from ORS builder. So we decided to collect all such kind of questions from everybody and present it to ORS builder. We are planning to submit those questions on 20th of March. Once we will receive the answers from them (in written), we will take our next step.

    If you have any concern or question which you want to include in that list or you want to see that list, you can mail me at netaddress@gmail.com or call me at 9990010860. I have already published the list of questions on Google docs but you have to provide me your contact details, name, allocation number, email id etc to get access on this list. I am collecting your contact details just to make sure that we can contact you.

    Please feel free to ask me anything or call me at 9990010860.

    I also want to request all of you to join me on 20th March to submit these concerns to ORS. Please send me your nomination to join me.

    Thanks
    Manish Gupta
    A1-503
    9990010860
    netaddress@gmail.com

  47. Hi Friends,

    I am sure everybody is looking for updates of the meeting held on 7th March. So here are the updates of the meeting.

    A few members from us were gathered on given time (I would like to thank them to be on time and looking for same support in future) and had a detailed look on the constructions. Here is the status of construction work

    Block A1 and A2 built up to 5th floor however block A3 has been developed up to 3rd floor only.
    Block B1, B2 were developed up to 4th floor
    Block C1 – just basement built and C2 is no where till now.

    We had a discussion about a few things in building with the engineer Mr. Bedi and he has answered them very well. These questions were related to the beams which were coming inside the rooms and which are noticeable in ceiling as well as seems to be wastage in Almira space. Well I am not the right person to judge it because I don’t have architect kind of expertise.

    After have a discussion with Mr. Bedi, we had some concerns which we need to get clarified from ORS builder. So we decided to collect all such kind of questions from everybody and present it to ORS builder. We are planning to submit those questions on 20th of March. Once we will receive the answers from them (in written), we will take our next step.

    If you have any concern or question which you want to include in that list or you want to see that list, you can mail me at netaddress@gmail.com or call me at 9990010860. I have already published the list of questions on Google docs but you have to provide me your contact details, name, allocation number, email id etc to get access on this list. I am collecting your contact details just to make sure that we can contact you.

    Please feel free to ask me anything or call me at 9990010860.

    I also want to request all of you to join me on 20th March to submit these concerns to ORS. Please send me your nomination to join me.

    Thanks
    Manish Gupta
    A1-503
    9990010860

  48. Hi Friends,

    One more thing I am observing. Till now all the members who have contacted me belongs to A1 tower.

    Is there any members who belongs to Tower B or C.

    Regards,
    Manish Gupta

  49. Hi Friends,

    Here is another updates from my side.

    Till now I received three/four new people who asked me to grant the permission for the question list.

    We were suppose to meet ORS people on 20th March but (sadly) no body replied me to say that he wants to come with me.

    I want to make you understand one thing very clearly, that this effort should be jointly. Not one person show. So I urge you to nominate your self to join me for some future date (may be 3rd of April).

    Another update, I was just going through the discussion forums of some other builder and the investors of those projects were also trying to meet their builder in coming weeks. I have collected some questions from their forum which we can include in our question list as well.

    1) Get the details of fittings in written from ORS: We as buyers have the right to know what we are getting for the money we paid.This information is required for us to decide what additional upgrades we can purchase from the builder.

    2) Confirmation on responsibility of ORS group for two years after possession [List of services that they will provide. like security, maintenance, repairs, day to day tasks etc. Generally they take the ownership of the maintenance deposit and use the interest on the same for all these things. Plus they will ask for a per month maintenance money from each owner]

    I hope that I will get some reply on this blog only from other members.

    Regards,
    Manish Gupta

  50. Guys,

    Please check out this link as well.

    Manish

  51. Hi Manish,

    Thanks for all your hardwork and effort done for the cause and i fully support you in this.Since its for the benfit of all the all the persons taken property in ORS.
    I will join you on 3rd april and do send the time and venue.I also request all the estimeed member to support Manish in his effort and lets join him so that we should have everything in written.

    Regards,
    Abhisek
    9999353142
    B-104

  52. Hi Abhishesk,

    Thanks for reply.

    I got reply from Arvind also. He will also join us. and I hope that some other members would also like to join us on 3rd April.

    Please suggest if 11:00 AM on 3rd April will suits you or not. I believe nobody comes in ORS office before that.

    The venue should only be ORS office in sector 16, faridabad.

    Once you guys will confirm the date, I will call Vipin (ORS) to book his calender as well.

    I will bring the question list along with me.

    Regards,
    Manish Gupta

  53. Hi Friends,

    We are going to ORS office this saturday which is 3rd april at 11:00 AM with all open questions. Arvind and Abhishek is also coming.

    Can I again request you to join us…..Please reply or contact any of us (arvind, me , abhshek).

    Regards,
    Manish
    A1-503
    9990010860
    netaddress@gmail.com

  54. Hi Guys,

    Another press release from Bhaskar about the status of Neharpar area progress.
    This was published on 21 March, 2010.

    http://www.bhaskar.com/2010/03/21/100321013053_master_road_budget_given_green_signal.html

    Regards,
    Manish Gupta

  55. Hi Friends,

    We had a meeting with ORS (Vipin) last Saturday (3rd April, 2010). And here are the details of that discussion

    Participants: Arvind Mathur, Manish Gupta, Abhishek, Vipin (ORS)

    We have given the list of questions to Vipin and Vipin said that he would like to answer those questions in written by 10th April. He will send the answer to Manish in email and Manish will circulate those answers to everybody. We suggested him to post all answers on the blog itself but he denied this option.

    I would like to give you the highlights of discussion here as well.

    Details:

    1) We first of all had discussion on the basic immunities provided by Huda. Vipin is still saying that these immunities will be ready by March 2010, and same is the target date ORS is considering for possession. Regarding the RTI of Huda, Vipin said that they have given the dates with sufficient buffer time that’s why it seems to be a long time; otherwise they will complete it by March 2011 only. Although we told him that in spite of buffer time, their first milestone which is possession of land (which supposes to be completed by March 2010 as per RTI) is already delayed. Vipin says that you should wait for another month and he will have something to show in this area.

    2) Date of sample flat – As usual Vipin is saying next month it will be ready. But he would like to revisit his plans and will answer this question on 10th April. We clearly told him that this time whatever date he will give, the sample flat should include each and every internal accessories which they are suppose to provide. Nothing should be pending.

    3) Vipin disclose the fact that they haven’t sell out even a single flat in some of the blocks and they are planning to see them at premium prices once the infrastructure will be in place. The number of these blocks is

    A3, B3, C1, C2

    Dear friends, please note that they have total 8 blocks in the society and half of them are not planned for sale. I am not sure what is the status of other blocks like A1, A2, B1, B2. Only ORS knows that they are sold completely or not.

    4) Another question was that why the C blocks are not yet started for construction. Vipin said that they are planning to start those blocks from pre monsoon session. And they will build those block at full speed (I believe rocket speed 🙂 ) and in march 2011, when they will give the possession of other flats, the interior work will be executed in these blocks. What a plan, amazing.

    5) Vipin also clarified that they are not taking care of any request of modification as per suggested by users for their flat. If they consider so, it will result in further delay. Moreover it will cost ORS a little bit more.

    6) Vipin also indicates that in this year they may offer buyers the option of buy back which is absolutely rubbish.

    Now we are waiting for the answers from Vipin. I hope they will give some realistic and feasible answers.

    Please feel free to contact me in case you have any other concern.

    Manish Gupta
    99900-10860

  56. Hi Friends,

    I didn’t recieve any call/email/reply from Vipin yet. I will update the blog as soon he will send something.

    Manish

  57. Hi Friends,

    Here I am posting the another RTI whcih came for FNG express.

    Today, one of my friends got RTI responses from NHAI with regards to Eastern Peripheral Expressway whose one portion is known as FNG expressway whose publicity Builders do when selling flats in Faridabad, NOIDA and Ghaziabad. Shockingly, work of expressway has not yet started and there is no expected date of completion. Surprisingly, width of this ‘expressway’ will be only 27.5 M

    Q.1 What is the current status in terms of how’ many percent it is completed and areas it has covered?

    Ans- The EPE is in bidding process. The current status in terms of percentage of completion is Nil. The EPE begins at KM 36.083 of NH-1 in Distt. Sonepat (Haryana) and passes through Distt. Baghpat, Ghaziabad, Noida, Faridabad and ends in Palwal at KM 64.330 of NH-2

    2. What is the expected date of completion?

    Ans- The work is yet to be awarded therefore it is not possible to indicate the expected date of completion

    3. Are there any issues which are causing delays to this project? If yes, what are those issues?

    Ans- The project is delayed due to re-bidding. Earlier NHAI receive bids on 23-12-2008 and a single bid was received. The Ministry did not allow to open single bid and directed NHAI for fresh bidding after reassessment of engineering. Now, last date of receipt of RFP document is 31-03-2010

    4. What will be the width of the roads in this expressway? How many lanes will be there on each side?

    Ans – The width of the road will be 27.5 m with 3 lanes on each side.

    Regards,
    Manish Gupta
    9990010860

  58. Hi Friends,

    Another link which tells that HUDA is facing issues while acquiring the land for basic immunities,

    Manish Gupta

  59. Dear All;

    We had a meeting with the ORS team on 25th April but couldent update the community due a tight schedule at my end.

    A quick snapshot of whats in store.

    1. As per the ORS team are we should get the posession by second half of Next year. The delay is only due to the slow development of infrastructure by HUDA which should get paced up into the next 3 months.

    2. The sample flat should be completely ready by June 2010 end as indicated. The plastering work is almost finished and the floor and tile work will soon commence. We can follow up for weekly updates on its progress.

    3.The layout of the club is changed from the original plans and the Architect has to submit alternate plans to ORS.

    4. Last sunday of Every Month has been agreed upon as the day where we will meet the ORS team to map progress on the project and this is a very healthy development for the stakeholders of the project and we urge active participation from all of you.

    5. With Regards to the recent service tax implication , it was discussed that any tax liability arising out of it will be on the buyer and not ORS ; however its actual implication is still contested on projects bought earlier than this release and the base amount on which this tax has to be paid.

    What seems positive is that the ORS is updated and actively involved on the developments happening around the project , they are engaging with HUDA authorities and trying to build pressure to go ahead on the infrastructure bit.
    Our suggestions have been incorporated to make arrangements for a washing machine point in one of the balconies. This was suggested in our earlier meetings.

    Please feel free to reach out to me for any specific points you would like to discuss and request to join us for the next meeting.

    Many thanks and Regards
    Arvind Mathur
    A1 – 703
    9910129922

  60. Hello,

    Did any one get a chance to visit the site.???

    I was told by ORS team that sample flat’s flooring has started. So just want to make sure that its really happening.

    Please share the updates.

    Thanks
    Harvinder

  61. Hi Harvinder,

    Arvind amd Me are planning to visit the site on next week end that is 15th May. We will be happy if you can join us.

    Since it is already too hot in the day time after 10:00 AM so i would like to suggest the time before 10:00 AM or so. Please suggest if this suits you or not.

    Regards,
    Manish Gupta
    9990010860

    • Hello Manish,

      I would be able to confirm you the same in next week, definitely before (15th May) :).

      Thanks for the information.

      Thanks
      Harvinder

  62. Guys,

    Keep on checking this as well 😦

    http://www.indiaspaces.com/blogquestion.aspx?qid=110

  63. Hello Manish/Arvind,

    Since I have some official work planned this Saturday, I will not be able to accompany you guys.

    Would you be able to take some pictures of the Site and ofcourse of the Sample flat in progress?
    Please have them uploaded here.

    Thanks
    Harvinder

  64. my flat number is 504 2 bhk tower b2, i think sample flat is ready in may,i have ful faith in ors people,they r very helpful and very coperative , 100% SURE THEY GIVE THE POSSESION ON TIME. MY NUMBER IS 9811096600, IF THERE IS ANY MEETING OR ANY FUTURE VISIT AT SITE PLEASE LET ME KNOW.

  65. Hi Guys,

    I visited the site on Thursday (13th May’10).
    6th floor construction is going on for A1 & A2 tower and 3rd floor construction is going on for A3 tower.

    I met Mr.Vipin & Mr.Rajendra Gupta (R in ORS). They told us that the construction should be completed by March’11.

    However, the road work has not been started yet. They told us that it should start by next month.

    Regards
    Krishan
    Ph.9891147877

    • Hello Krishan,

      Thanks for these updates.

      But at this point of time our main focus is on the sample flat.

      Do you have any update on this? June end is the time when ORS has committed us to complete the same. Not sure if you got a chance to had a look at that. Please share any info related to it.

      Thanks
      Harvinder

      • Also another thing here, LAND AQUISITION has not yet started since there was some issues raised by land owners.
        Road work can not start until this issue is completely resolved and even after that it is expected to take significant time to start since it is a government owned exercise. I am not sure how Vipin has told you that this would start next month.
        Would you like to double check with him on this and let us all know here.

        Thanks
        Harvinder

      • Hi Harvinder,

        I had a discussion with Krishan on 23rd May. During our discussion, i asked him about the status of Sample flat and he was saying that ORS people are planning to start the floor work by 14th May. Which means that the floor work has not been started up to 13th May.

        As per Arvind’s last meeting with ORS people, it was decided that we should have a meeting with them at least once in a month. I believe time has come to have a meeting with ORS.

        I request you to nominate yoursel for a agreed date and let’s discuss the development made in this month.

        Regards,
        Manish Gupta

  66. Hello Manish,

    I am ready for this meeting. Please have one scheduled for coming weekend. My preferable time would be Saturday evening, Sunday Morning or Sunday evening.

    Also before we meet ORS folks,I think we should visit the site. How about Saturday early morning, around 7:00 AM?

    Your thoughts please.

    Thanks
    Harvinder

  67. Hi Guys,

    This is a good link which explains about the service tax on apartments implementd in Budget 2010-2011.

    http://economictimes.indiatimes.com/quickiearticleshow/6019078.cms

    Regards,
    Manish

    • Thanks Manish for this Information.

      It seems that a big amount is coming our way to be paid 😦

      Also please upload the Video and Photographs of the Site that we collected last saturday.

      Thanks
      Harvinder

  68. I just got to know that HUDA has issued a fresh RTI response on 4th June’10 which states that the EDC work in Neharpar area is extended till Nov’17 instead of earlier Sep’13. If this true then its really too shocking dontknow what to do now…

  69. This is really sad..(if at all true). Abhishek , could you please share the source(any link) of this news?

    Also I would like to give you guys some updates on the sample flat.
    With the current pace of the work, there is no way we can see the sample flat ready within next 6 months. Even if they try to speed up their work right from today, it can not be ready before 3 months. I am not sure how we have been committed a June end date. 😦

    Another observation was the poor quality of the flooring. The tiles are not in proper level and you can easily feel the same by touching them.

    If any one else has visited the site recently, please share your thoughts.

    Thanks
    Harvinder

  70. Hi Harvinder…

    I am not sure how true is that but any was you see it on
    http://www.indiaspaces.com/blogquestion.aspx?qid=120&cmtid=21765

  71. Hey Guys,

    Don’y Panic,

    Please read the complete comments of the reply made for 2017 stretch

    Please go through the below Q&A…..

    Why you have not disclosed the latest RTI information till now? from past 3 months i am seeing your same reply that you will be posting it shortly.

    Reply: The reply received earlier was incomplete and required more details from local office and we found contradictions in media claims and RTI response and we waited for the next response. It takes around 45 days for every new response. and the latest response which talks about 2017 time line creates contradiction between faridabad and chandigarh office. so it is important to have a clear understanding before putting everything in public domain and spreading panic and confusion. internally we are working on it but at the same time it is our responsibility to check and scan everything thoroughly. publishing a response would add to panic unless throughly verified. instead of raising questions on credibility, why dont you spare some time and work with us in trying to get a clear understanding of the matter and then you would understand. it is very easy to demand for things

    Regards
    Rajeev Agarwal

  72. Hi Everyone

    Just came across this blog! Its a wonderful effort made by you all. I have a flat in their tower B1- 304 (3rd Floor).

    I live in Fbd only, please share when you guys are going to have a meeting with the ORS, and I will join if it is on a weekend.

  73. Hi Friends,

    Sorry for the late posting but i have some photos of site which i clicked in the early May 2010. You can check these photos on

    http://picasaweb.google.co.in/netaddress/ORSSampleFlat

    i will also uploaded one video on youtube.com and post the URL.

    Thanks
    Manish

  74. Hi Manish,

    Thanks for all your effort and it was really nice to see the snap and waiting for video to be uploaded.

    Abhisek

  75. Hi Friends,

    Here is the URL of video (May 2010)

    Thanks, Manish

  76. Hi friends,

    Here is the URL of Video (May 2010)

    Thanks
    Manish

  77. Hi Friends,

    Here I found another concern area which is related with not only the ORS but with all high towers being buit in faridabad.

    http://www.hindustantimes.com/In-case-of-fire-don-t-call-Faridabad-fire-services/Article1-584037.aspx

    Regards,
    Manish

  78. Hello All,

    Another update on Nehar Par Master Road. This is again a disheartening news 😦

    http://www.bhaskar.com/article/HAR-OTH-increased-the-amount-1270338.html

  79. Hi All,

    The award for land acquisition would be declared on 27th August, 2010 in 2 phases at Sector 12 Huda Office, Faridabad. Half of the villages(Baselwa, Mawayi, Palwali, Tikawali, Riwazpur, Badshahpur, Faridabad, Budhena, Faizpur, Faridpur and Neemka) will be covered in the first phase at 11:00 AM and rest of the vilages(Bhatola, Baddoli, Khediklaan, Khedikhurd, Bhupani, Wazirpur, Prahlaadpur and Mirzapur) will be covered at 3:00 PM. All land owners have been requested to be present during this time.
    The award declaration activity will be carried out by Huda Officer Arvind Singh Malhaan.

    This news has been captured from Dainik Bhaskar Faridabad, Dated 26th August 2010 (pg#10).

    Thanks
    Harvinder

  80. Hi Everyone,

    Farmers boycotted the award ceremony and have decided to go on hunger strike starting today -Aug, 30th 2010. They will continue their strike for next 19-20 days.

    This seems to be an un-ending issue and expected to go in a deadlock situation.

    Haryana Govt. is already very slow in nature and a concern like this will make the whole process to stop and we (the Users) will be the ultimate sufferers 😦

    Thanks
    Harvinder

  81. Unfortunately this is just a wait and watch situation for us.

  82. A question was asked for ORS Royal Residency – Check this out.

    http://www.indiaspaces.com/Opinions.aspx?cmtid=22641

  83. Hi,

    If any body has visited the site in recent times….what is latest development.Any sign of sample flat getting ready ?

  84. From our last discussion with the ORS folks, it seems they are not too interested to complete the sample flat since that would add to their maintenance cost. 😉
    So do not keep any expectation until the infrastructure starts building up.

    Also please check this out . Farmers protest is still on and its quite aggressive this time –

    http://www.bhaskar.com/article/HAR-OTH-not-satisfied-with-the-assurances-of-1383018.html

  85. Hi Friends,

    I am not happy to see this article however I feel that all these strikes and protest are driven by some local leaders.

    I completely agree that we can not hope for the possession of our apartments until/unless this issue get resolved.

    I think ORS can not do anything to solve this issue. All what they can do is just wait and watch. Once this issue get resolved then only they can commit anything. I can understand their problem that when even they don;t know when this will be resolved, they can not commit any date or any internal accessories.

    I suggest that ORS should atleast complete their plans and be ready for action as soon as some news comes from the HUDA.

    Lets keep an eye on faridabad news.

    Regards,
    Manish

  86. I think you are right Manish. But the main fear is that the things should not get more delayed because of this issue.
    FYI- An year back (24th Sep 2009) there was a similar award ceremony event organised by HUDA for distributing the award money of Rs. 16 lakh to each Farmer but that was boycotted. HUDA took a complete year to come back with the revised award amount this year which is around 60 lakh. This was again boycotted on 27th August 2010.
    Now not sure how long it will take for them to settle down since we dont see any rigid thing happening from HUDA or Govt. side as of today. 😦

  87. Yes Harvinder, that is the biggest concern for everybody (we as a apartment owner and ORS as builder).

    I request everybody to think about this issue and suggest what we can do about this issue. Frankly speaking I feel myself to be helpless.

  88. Hi Friends,

    Just wanted to share that ORS has uploaded some new pic of the site

    check it on http://orsinfra.in/site.asp

    Manish

  89. Hello Guys,

    Huda has declined to give any time line for the infrastructure development of Greater Faridabad in the reply to the latest RTI 😦

    Please check the lastest comments here –

    http://www.indiaspaces.com/blogquestion.aspx?qid=120&cmtid=21765

    Thanks
    Harvinder

  90. Hi Harvinder,

    Thanks for posting this and let us know about this blog.

    I already asked the owner of this blog to include me also whenever he plan for any action.

    Please see my post on this site below with reply.

    My Post
    I am following your blog from last couple of months and i have also the same concerns which other people have (who have invested in nehar par area) I belongs to the ORS Infratructure ‘s project (know as Royal Residency) in sector 89. Please count me as well and I will try to call a couple of people who have invested in this project.

    Reply: thanks for all the support. Infact we would need a much bigger number to join hands. The kind of legal battle I forsee would require large number of people to be a part of the movement.

    Regards,
    Manish

  91. I simply can’t understand how this is related to our project. Are they talking about some new sectors or those earlier planned sectors only?

    • They are talking about the existing sectors only. It seems that the sectors mentioned in the above news are majorly commercial ones and government is not facing big issues in acquiring them. But the major concerns are with the other residential sectors like ours.

      Also just to let you know that the farmer’s strike has ended yesterday after 32 days. DC-Mr. Parveen Kumar has assured them to take uptheir issues and demands to Govt. and would revert back in one month. Farmers are going to organise a rally on 2nd October in this context. This news has been captured from Today’s Dainik Bhaskar (Dated – October 01, 2010).

  92. Hi Friends,

    LICHF has increased the rate by .5% on 1st Oct and it is now 13%. Do anybody have any idea that are they going to increase the home loan interest rate as well?

    Manish

  93. Hi Manish,

    Atleast I am not aware of this change. I did not receive any notification.

    -Harvinder

  94. Hi Friends,

    Here is another updates, I get a chance to visit the site on 16 Oct 2010. I didn;t click any photo but here are the updates

    1) Tower A1, A2 has been build upto 8th floor
    2) I am not sure why tower A3 is still build upto 3rd floor only
    3) Tower B1 and B2 are upto 6th floor.
    4) I am happy to see that Tower A5 has been build upto 2nd floor. But not happy to see that Tower A4 is no where till now.
    5) The most attractive Piece – Sample Flat – The tiles has been stup on floors and in toilets (master bedroom is exception) . Doors has been setup for balconies in Rooms, kitchen and living room. Almira are almost setup (I am not sure how we will open them in daily routine, there is no handle to open them. May be ORS will provide some handles). No porgress in kitchen. The biggest worry is that doors setup in baconies don’t have lockes (with keys) they are simple locks which can be easily opened from inside. In master bedroom they have provided sliding door. Not sure why this is not same for all the doors.
    6) Roads are in same position because HUDA is still struggling with farmers for land.
    7) Work is going on in very slow speed as I could see only 20 people (labour) working on the site.

    I would be extremely happy in case the flats would ready on todays dates as promised but lets hope that HUDA will resolve the issues and then we can expect some awesome construction speed from ORS as well.

    Thanks
    Manish

    • Thank you Manish for this valuable inputs.

      There seems to be some positivity in the Land acquisition issue where 110 Farmers have recieved the money. Also it has been heard that government is going to start the land acquisition forcefully now in November.

      Thanks
      -Harvinder

  95. Latest News on Greater Faridabad

    1.Farmers have stopped their agitation related to land acquisition for Neharpar area( except for IMT sectors where the dharna is still going on)

    2. Only few farmers have come to pick up the offered compensation.

    3.Only 60% of bypass road is complete.(Estimated DoC is Dec 2010). On time completion is highly unlikely as HUDA is yet to remove residential and commercial encroachments and going very soft on these.

    4.There is no news of Faridabad connectivity to the Noida-Ghaziabad road (FNG), whose development is going at full swing in UP.

    5.Eastern Peripheral Expressway
    a) NHAI has acquired 92% of total land required
    b) Fresh Detailed Project Report is being prepared.
    c) Rebidding will be done.

    6.Metro construction work is going to start very soon to take Metro to end of Faridabad (YMCA chowk) from Badarpur. This has probably no direct impact on our area of concern as of now.

    7. The last heard excuse of HUDA and Mr Hooda for missing Neharpar development was inavailability of labour due to CWG preparations.Now since CWG is over, we are yet to hear any new excuses.

    8.Since MLA representing Neharpar area is from BJP, they will always try to ‘use’ farmers sentiments to create trouble for Congress Hooda.

    Abhisek

  96. Hi Friends,

    Wish you a happy diwali (I know I am late)

    I hope you have celebrated the Diwali very well and enjoyed the lights (we were suppose to celebrate this diwali in our new home, let hope for the next Diwali, do you think even that is achievable).

    Do anybidy have any updates.

    Please keep posting the messages.

    Manish

    • Hi Manish & All,

      Same to you.

      My calculation says, 300 Flats can not completed in less then 365 days.
      A supernatural power can surely do this 😉

      -Harvinder

  97. Wow, a great analysis from Harvinder. .

    What do you think, 2 days per flat would be enough or you think it would require more days 😉

  98. Even that looks challenging with the current status of work.

    My perception is –

    Possession in 2011 is surely IMPOSSIBLE. (irrespective of Infrastructure development)

    Possession in 2012 is 50-50.

    Possession in 2013 is most likely.

    Guys, please share your thoughts.

  99. Heard that farmer have agreed to the compensation offered by HUDA.Hopefully this is true and now atleast some work will get start.

  100. Not a good news

    What else we can expect from such SARKAARI department

    This clearly shows how much serious the department is all about NeharPar area.

  101. Just managed to visit site last saturday , the work is going on is very slow..god knows when they will complete the sample flat.this year also completing in 24 days.

    LIC has also stopped releasing fund to ORS dont know what the exact problem.Vipin if you ready these comments can you please update us.

  102. Vipin,
    Could you please reply back to us soon on the status requested by Abhishek.

    On a different note –

    I think the day is not far when we will hear a news that HUDA officials have made a big SCAM related to the compensation amount of the Farmer’s in NeharPar Area.
    Seems like they have eaten up all money and now to delay the entire process, they are declaring that files are missing.
    I believe that its the time when all NeharPar Builders/Developers/Investors and the end users should unite together for a big protest against HUDA. If this doesn’t happen soon, we might need to sit for many more years waiting for our Dream Homes 😦

  103. Also guys, I have heard that there was a Income Tax raid conducted on all BPTP offices on December 07th. I am not sure what was the outcome of it. If any one else have some news on it, please share.

    Thanks
    -Harvinder

  104. Guys,

    There was a news in Saturday’s news paper that Huda Official performed some intial marking of planned master road in Neharpar area(on Friday) without any issue from the people of that area but when they went the next day(Saturday), there was lot of protest. Officials were sent back without any progress. I am attaching the link of the latest news. Check this out –

    http://www.bhaskar.com/article/HAR-OTH-arukkaai-spotter-farmers-1736207.html?HT3=

  105. Another bad news.

    I still can’t see any good development. God know when this issue will be resolved. 😦

  106. Guys,

    There was a meeting held in CP for discussing the Nehar Par issues. This meeting was organized by people like us (endusers).

    You can get the updates from the below link

    http://www.myfaridabad.in/forum/greater-faridabad-meeting-sunday-16-jan-12-pm-at-central-park-connaught-place-rajiv-chowk-metro-station-t387.html#p162

  107. Guys,

    Check this out – Another scam in Neharpar Area.

    An additional reason for delay in development of this area. 😦

    http://www.bhaskar.com/article/HAR-OTH-million-blow-to-the-scandal-huda-1781548.html?HT1=

  108. Hi Harvinder,

    This is really not at all a good news and this clearly shows that if HUDA is going to take more time, then this kind of problem will be increased drastically.

    Manish

  109. Guys,

    Check this article in Hindustan times –

    http://www.hindustantimes.com/Investors … 53929.aspx

    Investors lament delays in acquiring faridabad land

    Prabhu Razdan
    FARIDABAD

    Inordinate delays in land acquisition for infrastructure development has investors in Greater Faridabad a worried lot. A large number of such investors have now formed a body -Greater Faridabad Welfare Association -to take up the issue.
    After having raised the matter with local authorities, the investors have decided to aggressively take up the matter with state authorities, including Haryana chief minister Bhupinder Singh Hooda.
    “We met officers of Haryana Urban Development Authority (HUDA) in Faridabad, enquiring about reasons for the inordinate delay in infrastructure development but the response was not satisfactory,“ said Jayanta, who heads the association. “There are no roads, no electricity and no sewage lines,“ said Dheeraj Jain, another member of the association.
    HUDA had created new sectors and issued licenses to private developers in the area a few years ago. But non-acquisition of land had hampered development in the area.
    While people from 19 villages were initially against the government’s decision to acquire their land, the issue had been resolved with farmers claiming compensation.
    “We have disbursed about R300 crore among 50% of the villagers,“ said Arvind Malhan, estate officer, HUDA, Faridabad.
    “The rest will be disbursed within a fortnight. Once that is done, developmental activity in Greater Faridabad will follow.“

    Thanks
    Harvinder

  110. Guys,

    Here is the link to file an RTI to get any information from Government –

    http://rti.india.gov.in/

  111. Guys, please join this petition, if this happens, it will be a great appreciation for Greater Faridabad.

    Cross your fingers, click on the link given below and join.

    http://www.myonlinepetition.com/petition/481/Join+for+Delhi+Metro+going+through+Bye+Pass+Road/

  112. Guys,

    Are you ready for the protest on March 01, 2011 at Huda office Sector 12, FBD @ 10:00 AM

    -Harvinder